Closed

The QUBE Effect and Valley Fiesta 2027-2029

BRISBANE CITY COUNCIL · Ref AU-1178049 · Australia (Commonwealth)

RFP · Event Management · Value not stated

BRISBANE CITY COUNCIL.

THE QUBE EFFECT AND VALLEY FIESTA 2027-2029.

RFx Number: Doc118919169.

Tender Type: RFP.

Close Date: 20 November 2026, 12 Noon.

DISCLAIMER: This information is subject to change...

Open tenders from this buyer

Contract awards for similar work

Matched by title words (heuristic)

8 awards with “effect” in the title; 6 publish a value: AUD 10,000 to 1,644,709, median 1,033,717. Not a price guide for this tender.

Contract awards for similar work
ContractAwardedValue (AUD)

Exit Relocation of Personal Effect

Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts · Australia (Commonwealth)
2 Jun 202610,000

Stubble management is a significant issue in Western Australia particularly in the high rainfall zone, where it is not uncommon for cereal yields to reach over 7 t/ha with the resulting stubble loads being up to 10 t/ha. This is a high amount of stubble residue left post harvest and is an increasing concern for local growers due to poor establishment of following crops, nitrogen (N) tie-up, disease carryover issues and seeding operation inefficiencies such as, blockages, hair pinning, poor soil throw and bulldozing. As a result, plant establishment has become increasingly difficult, particularly Canola establishment.  Traditionally, high stubble loads in the region have been removed by burning, however, there has been a move away from burning due to a combination of social license issues, as well as farming system concerns. Burning increases the risk of erosion and nutrient loss and decreases soil moisture. Growers are also concerned with Nitrogen (N) tie-up from retained crop stubble. Although cereal stubbles contribute very little N to the following crop, stubbles are a source of carbon and N is required from the soil to breakdown this high carbon material. Previous GRDC research has been conducted to understand the additional N requirements needed to overcome early N immobilisation by stubble, this research suggests that an additional 5-6 kg N/t of cereal residue can help overcome the issues of stubble N immobilisation. (https://grdc.com.au/resources-and-publications/grdc-update-papers/tab-content/grdc-update-papers/2018/02/the-effect-of-stubble-on-nitrogen-tie-up-and-supply). Investigation into whether the addition of nutrients, in addition to an enzyme ‘digester’ to stubble in conjunction with mechanical stubble treatments, during the summer fallow period, can increase the rate of stubble breakdown to allow for improved winter crop establishment (especially canola) and reduction in early season nitrogen tie-up. Reduced carryover of stubble-borne diseases could also be explored via observations

Grains Research and Development Corporation · Australia (Commonwealth)
1 May 2025235,988

ANSTO have awarded the contract to Ford Civil to implement a geo membrane capping to reduce rainfall infiltration into a series of waste disposal trenches that contain a variety of hazardous wastes historically buried at the Little Forest site. By reducing the water infiltration, the capping aims to reduce the migration of hazardous particles through the underlying groundwater and reduce the “overflowing bathtub” effect observed during periods of heavy rainfall. The capping is to perform as an interim solution (with a 10 to 15-year design life) whilst being maintainable and allow for the continued and ongoing monitoring and research activities that are performed at the Site.

Australian Nuclear Science and Technology Organisation · Australia (Commonwealth)
4 Jul 20241,501,275

Showing 5 of 8.

Sign in to see who holds these contracts.

Updated 9 November · Dates checked against the portal on 9 November 2026 · Sydney time; the buyer's state is not known · How we collect this data

Contains data from State of New South Wales, NSW Treasury; Department of Finance (AusTender), CC BY 3.0 AU.