SWTAFE F Building Mechanical Upgrade Project (reduced scope)
South West Institute of Tafe · Ref RFT2026CMW002.03 · Victoria
RFT · Published 30 October 2026 · Heating and cooling and air conditioning HVAC construction and maintenance services · Value not stated
Heating and cooling and air conditioning HVAC construction and maintenance services
Summary of the tender's own page
SWTAFE seeks a contractor to replace HVAC infrastructure in F Building at its Warrnambool City Campus. The successful contractor will act as Head Contractor and coordinate and deliver the construction implementation, including design and engineering, authority engagement, investigations, approvals and onsite works. The scope includes site establishment and safety measures, demolition and making good, structural and electrical interface works, and supply and installation of mechanical systems. It also includes testing, commissioning, quality assurance, documentation, as-built drawings and handover. The documents describe the scope as a reduced-scope project but do not state a contract value or quantities.Show moreShow less
Stated requirements
- Provide management, supervision, labour, plant, materials and temporary works to deliver the upgrade in accordance with the tender drawings, specifications, demolition drawings, schedules, Section J, applicable codes and Australian Standards.
- Allow for required site investigations and reviews of existing infrastructure, and obtain relevant approvals and sign-offs.
- Establish site facilities and protections, arrange permits, and provide temporary ventilation or air conditioning, dust and noise controls, and temporary fire protection measures to maintain operations during the works.
- Decommission and remove redundant mechanical plant and ductwork, and make good affected ceilings, walls, roof and waterproofing.
- Provide certified structural shop drawings for platforms, penetrations and supports, and the electrical works needed to power the new mechanical system, including switchboards, cabling, labelling and test results.
- Supply and install the specified mechanical equipment and associated ductwork, pipework, louvres, weather hoods and balancing provisions.
- Reference any tender addenda in the tender response as outlined in Part C Annexure J, Section 2.
Eligibility
- The tender seeks submissions from suitably qualified and experienced mechanical contractors.
Contract awards for similar work
Matched by title words (heuristic)9 awards with “reduced” in the title, all with a value: AUD 22,107 to 3,783,518, median 835,350. Not a price guide for this tender.
| Contract | Awarded | Value (AUD) |
|---|---|---|
The concentration of phosphine residue in grain post fumigation (where it is currently being measured) that poses no risk to workers is unknown. The SWA TLV-TWA is soon to be reduced to 0.05 ppm. Continuing current practices could result in the loss of phosphine as a registered stored grain fumigant and there is an urgent need to optimise post-fumigation protocols. This investment will address this by delivering: * Data packages required to update the phosphine label registration with the APVMA, including appropriate ventilation and withholding periods to reduce phosphine residue in grain to thresholds that meet SWA worker exposure limits. * A new or updated Australian standard for phosphine fumigation, including an agreed protocol of how phosphine residue in grain should be measured at receival sites to meet the SWA TLV-TWA, and appropriate clearance thresholds. * An on-farm protocol for growers to measure phosphine residue prior to outturn, to ensure residues are below thresholds set in the above standard. Grains Research and Development Corporation · Australia (Commonwealth) | 19 Aug 2025 | 2,295,271 |
Local growers report a yield ceiling in oats, unlike barley, suggesting a challenge in achieving higher grain yield. This may stem from higher biomass and a source-sink imbalance, making oats more vulnerable to environmental stress. Last season’s trials support this, showing excessive nitrogen reduced harvest index and grain weight, ultimately lowering yields—likely due to increased biomass and greater susceptibility to terminal drought. Grains Research and Development Corporation · Australia (Commonwealth) | 24 Jul 2025 | 135,541 |
Stubble management is a significant issue in Western Australia particularly in the high rainfall zone, where it is not uncommon for cereal yields to reach over 7 t/ha with the resulting stubble loads being up to 10 t/ha. This is a high amount of stubble residue left post harvest and is an increasing concern for local growers due to poor establishment of following crops, nitrogen (N) tie-up, disease carryover issues and seeding operation inefficiencies such as, blockages, hair pinning, poor soil throw and bulldozing. As a result, plant establishment has become increasingly difficult, particularly Canola establishment. Traditionally, high stubble loads in the region have been removed by burning, however, there has been a move away from burning due to a combination of social license issues, as well as farming system concerns. Burning increases the risk of erosion and nutrient loss and decreases soil moisture. Growers are also concerned with Nitrogen (N) tie-up from retained crop stubble. Although cereal stubbles contribute very little N to the following crop, stubbles are a source of carbon and N is required from the soil to breakdown this high carbon material. Previous GRDC research has been conducted to understand the additional N requirements needed to overcome early N immobilisation by stubble, this research suggests that an additional 5-6 kg N/t of cereal residue can help overcome the issues of stubble N immobilisation. (https://grdc.com.au/resources-and-publications/grdc-update-papers/tab-content/grdc-update-papers/2018/02/the-effect-of-stubble-on-nitrogen-tie-up-and-supply). Investigation into whether the addition of nutrients, in addition to an enzyme ‘digester’ to stubble in conjunction with mechanical stubble treatments, during the summer fallow period, can increase the rate of stubble breakdown to allow for improved winter crop establishment (especially canola) and reduction in early season nitrogen tie-up. Reduced carryover of stubble-borne diseases could also be explored via observations Grains Research and Development Corporation · Australia (Commonwealth) | 1 May 2025 | 235,988 |
B80769 - Pittsworth State High School - W/O 19484747 - SIE A Block - Refer to Tender Form dated 26/10/23 Line 001 reduced 17,320(Credits) 2.5% DLP Retention 2.5% PC Retention Additional weekend labour to remove ACM Provisional Sum Approved ACM removal Variation: Security disconnection Variaiton: Remove additional wall insulation Variation: Supply and install joinery - Shop B Variation: Signage PC Sum Variation Upgrade Power Board Variation Data Racks Variation Option A Data Upgrade Variation Extra Asbestos Removal Variation Asbestos Testing Change of scope for electrical duct work DHLGPPW - Public Works - QBuild · Queensland | 20 Jun 2024 | 835,350 |
End of project review of Rapid Breeding for Reduced Bean Cooking Time project in Kenya Australian Centre for International Agricultural Research · Australia (Commonwealth) | 26 Mar 2024 | 22,107 |
Showing 5 of 9.
Sign in to see who holds these contracts.
More open tenders like this
With “reduced” in the title · 2 open
- SWTAFE F Building Mechanical Upgrade Project (reduced scope)
South West Institute of Tafe · Victoria · no closing date published
- SWTAFE F Building Mechanical Upgrade Project (Reduced Scope)
SOUTH WEST INSTITUTE OF TAFE · Australia (Commonwealth) · closes 20 November 2026