Closed

Sealed Pavement Rehabilitation - Up River Road Stage 1

Buyer not published · Victoria

Civil Construction Services, Civil & Earthworks (General), Road & Streetscape Construction & Maintenance, Stormwater Harvesting & Drainage Construction · Value not stated

The scope includes a variety of rehabilitation treatments:

In-situ foamed bitumen stabilisation

Recycling or replacement of existing gravel pavements

New gravel overlays

Seal reinstatement

Ancillary d ...

Summary of the published description

The scope includes a variety of rehabilitation treatments. These include in-situ foamed bitumen stabilisation, recycling or replacement of existing gravel pavements, new gravel overlays, seal reinstatement and ancillary work.

Contract awards for similar work

Matched by title words (heuristic)

11 awards with “sealed” and “pavement” in the title; 1 publishes a value: AUD 1,039,500 to 1,039,500, median 1,039,500. Not a price guide for this tender.

Contract awards for similar work
ContractAwardedValue (AUD)

Alice Springs Region - Sealed Pavement Maintenance for a Period of 36 Months

Department of Logistics and Infrastructure · Northern Territory
21 Oct 2026Not published

Long Line Retro data collection and Re-marking programming The purpose of the project is to collect the delineation condition of long lines on TMRs sealed road network, analyse the data with consideration of condition and the road priority matrix in the TMR Element 24 management plan and road safety risk in dry and wet environments to model a draft repainting program. The quantitative data approach allows for model-based repainting programming that considers: • Safety risk to identify if roads are candidates for delineation that provides wet weather performance (e.g. wet weather performance line marking paint/beads and/or raised reflective pavement markers). • Identification of homogeneous segments within road segments that require repainting or may be candidates for a more durable paint/bead option.

Transport and Main Roads · Queensland
1 Nov 20211,039,500

Katherine Region - NEW QTOL ENABLED - Sealed Pavement Repairs for a Period of 30 Months - Mandatory Industry Briefing

Department of Infrastructure · Northern Territory
Not published

Showing 5 of 11.

Sign in to see who holds these contracts.

Updated 30 October · Dates last read on 30 October 2026 · How we collect this data

Contains data from Queensland Government agencies (contract disclosure reports), CC BY 4.0.