RFT 202627-003 Refurbishment of Headmaster House and Construction of Amenities Addition.

Shire of Mount Magnet · Ref MTMAG-1178285 · Australia (Commonwealth)

RFT · Civil Engineering & Construction, Construction, Pipe Supply · Value not stated

The Shire of Mount Magnet is inviting tenders for the Refurbishment of the Heritage Headmasters House and also the construction of an Amenities Addition.  The building is classed as a place of Exceptional...

Is this tender for you?

  • StageRFT.From the tender's own page
  • DocumentsNone held. We can't see addenda on this portal; check it there.Not held

Summary of the published description

The Shire of Mount Magnet is inviting tenders to refurbish the Heritage Headmasters House and construct an Amenities Addition.

Contract awards for similar work

Matched by title words (heuristic)

4 awards with “addition” and “construction” in the title, all with a value: AUD 134,510 to 5,275,195, median 2,017,376. Not a price guide for this tender.

Contract awards for similar work
ContractAwardedValue (AUD)

NCR Construction Pumicestone - Dances Rd Intersection Upgrade Road safety improvements including, provision of dual right-turn lanes, full signal control of the right turn, signalised pedestrian crossings, addition of bicycle lanes and new roadside barriers. Pavement resurfacing of existing footprint is also included in this project.

Transport and Main Roads · Queensland
7 Dec 20225,275,195

FTZD-Preconstruction Assistance and Contract Administration Services for YRU Services are required to assist contract document formation, constructability reviews and tendering for the preconstruction phase of Yeppoon Road Upgrade project. In addition, the same contract will cover the Contract Administration Services for the Main Construction contract. Combining the services into a single contract will maximise the effectiveness of procurement considering the tight delivery timeframes and ensure continuity of knowledge between preconstruction and construction

Transport and Main Roads · Queensland
1 Nov 20213,300,913

Detailed Design Blackrock and Palm Tree Creek 936845 Arup Group Ltd have been consulted to prepare a P50 and P90 Total Outturn Cost Estimates (four in total) for both the Palm Tree and Blackrock Creek Bridge Strengthening Projects with the following options: a) Proposal #1 – Case B which involves the addition of new PSC deck-units to either side of the bridge and the strengthening of the internal PSC I-girders b) Proposal #3 – Option 3b” which involves the replacement of the bridge deck in its entirety Once a decision is made for the preferred option coupled with the Total Outturn Estimates and approval the Type 3 Scope Identification Reports (completion of KM4), detailed design will commence. The detailed design will include, but limited to (further detailed in the Design Brief): • Detailed design and RPEQ certification of selected option • Production of Design Development Report • Pavement/ guardrail design and geometry checks against applicable standards if the preferred option is Proposal #3 and realignment is required • Constructability review • Construction Program • Establishment of schedules • Assist in development of contract documentation (technical specifications TIC-CO)

Transport and Main Roads · Queensland
11 May 2021733,838

Sign in to see who holds these contracts.

Updated 10 November · Dates checked against the portal on 10 November 2026 · How we collect this data

Contains data from Queensland Government agencies (contract disclosure reports), CC BY 4.0.