Closed
QEII – G block – replacement and relocation of Cold water valve #19
North Metropolitan Health Service · Western Australia
Building & Facility Construction & Maintenance Services, Building & Facility Maintenance & Repairs · Value not stated
Remove section of 200mm copper tube between cold water valve and first steel flange;
install new 200mm type B copper tube;
lower pipework along wall and install new 200mm Sureflow RSGV along wall at operable height;
install 50mm S/S lockable ball valve for system drain off and 2x 100mm Sure flow RSGV valves;
connect 100mm copper tube to main calorifer and connect pipework to existing pipework of backflow set up for chilled water makeup supply;
supply and install supports and clipping as required, test all new pipework for leaks and operation, and clean up site removing all redundant materials.
All works as per AS3500.
The notice states its status is Withdrawn, with the withdrawal reason “Incorrect dates.”
Summary of the published description
The procurement covers the replacement and relocation of Cold water valve #19 at QEII – G block. Works involve removing and replacing a section of 200mm copper tubing, lowering pipework along the wall, and installing new Sureflow RSGV and stainless steel lockable ball valves. The scope also includes connecting copper tube to the main calorifer and chilled water makeup supply backflow setup, supplying supports, testing pipework for leaks and operation, and site clean up in accordance with AS3500.Show moreShow less
Open tenders from this buyer
- Preventative and Reactive Maintenance Agreement for Reverse Osmosis (RO) Water Treatment Systems for NMHS Sites
closes 17 November 2026
- Reverse Osmosis (RO) Plant
closes 17 November 2026
- Preventative and Reactive Maintenance Agreement for Reverse Osmosis (RO) Water Treatment Systems
no closing date published
- Washer Disinfector System Solution - Supply, Installation, Post Warranty Support & Maintenance
no closing date published
Contract awards for similar work
Matched by title words (heuristic)4 awards with “qeii” and “block” in the title, all with a value: AUD 57,309 to 130,570, median 69,559. Not a price guide for this tender.
| Contract | Awarded | Value (AUD) |
|---|---|---|
Urgent replacement of domestic hot water infrastructure in DD Block at QEII. Health Department of Western Australia (NOT IN USE) · Western Australia | 20 May 2024 | 80,000 |
Supply, install and commission new Diesel Fuel delivery PLC Control panel at QEII Medical Centre - HH Block Health Department of Western Australia (NOT IN USE) · Western Australia | 1 Mar 2024 | 57,309 |
Supply and Installation of a Pneumatic Tube Delivery System from the J Block Mortuary to CSRA in PP Block at QEII Medical Centre Health Department of Western Australia (NOT IN USE) · Western Australia | 20 Dec 2023 | 59,117 |
Interim Asset Condition Report QEII Campus G and E Block Health Department of Western Australia (NOT IN USE) · Western Australia | 23 Oct 2023 | 130,570 |
Sign in to see who holds these contracts.