Closed
Provision of Power Supply for Stuarts Point Sewer Scheme
Kempsey Shire Council · Ref VP531003 · Australia (Commonwealth)
Published 26 October 2026 · ELEC, Lighting, Equip & Services, Electronic Components & Supplies · Value not stated
- Reference number
- VP531003
- Contact person
- Not disclosed
- Specification documents
- 25
- Issued by
- Kempsey Shire Council
Tender Details Kempsey Shire Council is seeking submission from appropriately qualified and experienced suppliers for the design, supply and installation of permanent power supplies for the Stuarts Point STP, Fishermans Reach Flushing Station and Grassy Head Pump Station. Council has prepared preliminary concept designs and load calculations for each site. Construction works on the Stuarts Point STP are scheduled to commence in February 2027. Temporary power supplied by Council for early STP construction, however timely delivery of the permanent power supply is required to minimise cost and improve reliability associated with temporary generator power supplies. Refer to the Tender Documents available for download for details of scope and further information. A mandatory pre-tender briefing and site inspection is held on Tuesday 03 November 2026, starting 11.00am. This is held at the STP Site, corner of Fisherman Reach Road and Tea Tree Trail, 700m south of 19th Avenue.
- Issued by
- Kempsey Shire Council
- Closing Date
- 17/Nov/2026 02:00 PM (UTC+10:00) Canberra, Melbourne, Sydney time
- Reference number
- VP531003
- Contact person
- Not disclosed
- Tender categories
- ELEC, Lighting, Equip & Services, Electronic Components & Supplies
- Specification Docs
- 25
How to respond
What the buyer asks for
- Be appropriately qualified and experienced
Who can apply
- Attendance at the mandatory pre-tender briefing and site inspection
Read from the tender's own page. Check the documents on the portal before you rely on this.
Summary of the published description
Kempsey Shire Council is seeking submissions for the design, supply and installation of permanent power supplies for the Stuarts Point STP, Fishermans Reach Flushing Station and Grassy Head Pump Station. Timely delivery is required to minimise the cost and improve the reliability associated with temporary generator power supplies.Show moreShow less
Open tenders from this buyer
- W6253_HBHP_O'Keefe Road Stabilization
closes 1 December 2026
- W6253_HBHP_O'Keefe Road Stabilization
closes 1 December 2026
- Hard Surface Street Maintenance Contract
closes 3 December 2026
- Frederickton Cemetery Stage 1 Upgrade
closes 15 January 2027
- Frederickton Cemetery Stage 1 Upgrade
closes 15 January 2027
Contract awards for similar work
Matched by title words (heuristic)3 awards with “sewer” and “power” in the title; none publish a value.
| Contract | Awarded | Value (AUD) |
|---|---|---|
Darwin Region - Lot 320A Rum Jungle Road, Batchelor - Water, Sewer, Power and Telecommunication Services Establishment Department of Infrastructure · Northern Territory | Not published | |
Darwin - Relocation of Hidden Valley Trunk Sewer HV Power Line, Berrimah Power and Water Corporation · Northern Territory | Not published | |
Darwin - East Arm - TESTING OF EXISTING POLYETHYLENE DN160 SEWER RISING MAIN TO POWER WATER CORPORATION REQUIREMENTS Land Development Corporation · Northern Territory | Not published |