Panel Contract for the Hire of Plant & Equipment - Mid West-Gascoyne Region
Buyer not published · Western Australia
Plant & Equipment, Plant & Equipment Hire, Building Products & Materials, Transportable & Demountable Buildings · Value not stated
The scope includes:
Provision of Plant and Equipment under Wet Wet Hire arrangements (Plant, Operator and Fuel supplied by the Contractor)
Provision of Plant and Equipment under Wet Dry Hire arrangeme ...
Is this tender for you?
We hold few facts about this tender. We found no closing date, requirements or documents.
- DatesDates last read on 9 November 2026. Check the buyer before you plan around them.Not checked on the portal
Summary of the published description
The scope includes provision of Plant and Equipment under Wet Wet Hire arrangements, with Plant, Operator and Fuel supplied by the Contractor. It also includes provision of Plant and Equipment under Wet Dry Hire arrangements.
Contract awards for similar work
Matched by title words (heuristic)155 awards with “plant” and “region” in the title; 101 publish a value: AUD 65,176 to 30,000,000, median 4,500,000. Not a price guide for this tender.
| Contract | Awarded | Value (AUD) |
|---|---|---|
Supply of Hire Plant and Equipment for the Tanami Road Upgrade - Kimberley Region Main Roads · Western Australia | 17 Apr 2024 | 304,798 |
Provision of Dry Hire and Wet Hire of Plant and Equipment (South West Region) Main Roads · Western Australia | 17 Apr 2024 | 3,926,195 |
Provision of Dry Hire and Wet Hire of Plant and Equipment (South West Region) Main Roads · Western Australia | 17 Apr 2024 | 3,926,195 |
Stubble management is a significant issue in Western Australia particularly in the high rainfall zone, where it is not uncommon for cereal yields to reach over 7 t/ha with the resulting stubble loads being up to 10 t/ha. This is a high amount of stubble residue left post harvest and is an increasing concern for local growers due to poor establishment of following crops, nitrogen (N) tie-up, disease carryover issues and seeding operation inefficiencies such as, blockages, hair pinning, poor soil throw and bulldozing. As a result, plant establishment has become increasingly difficult, particularly Canola establishment. Traditionally, high stubble loads in the region have been removed by burning, however, there has been a move away from burning due to a combination of social license issues, as well as farming system concerns. Burning increases the risk of erosion and nutrient loss and decreases soil moisture. Growers are also concerned with Nitrogen (N) tie-up from retained crop stubble. Although cereal stubbles contribute very little N to the following crop, stubbles are a source of carbon and N is required from the soil to breakdown this high carbon material. Previous GRDC research has been conducted to understand the additional N requirements needed to overcome early N immobilisation by stubble, this research suggests that an additional 5-6 kg N/t of cereal residue can help overcome the issues of stubble N immobilisation. (https://grdc.com.au/resources-and-publications/grdc-update-papers/tab-content/grdc-update-papers/2018/02/the-effect-of-stubble-on-nitrogen-tie-up-and-supply). Investigation into whether the addition of nutrients, in addition to an enzyme ‘digester’ to stubble in conjunction with mechanical stubble treatments, during the summer fallow period, can increase the rate of stubble breakdown to allow for improved winter crop establishment (especially canola) and reduction in early season nitrogen tie-up. Reduced carryover of stubble-borne diseases could also be explored via observations Grains Research and Development Corporation · Australia (Commonwealth) | 1 May 2025 | 235,988 |
Northern Region - Heavy Plant Unit - New Motor Grader DESI · Queensland | 4 Oct 2024 | 605,000 |
Showing 5 of 155.
Sign in to see who holds these contracts.
More open tenders like this
With “plant” and “region” in the title · 5 open
- Panel Contract for the Hire of Plant and Equipment - Great Southern Region
Buyer not published · Western Australia · no closing date published
- Darwin Region - Group 8 - Repairs and Maintenance of Airconditioning Plant and Equipment for a Period of 36 Months
Department of Logistics and Infrastructure · Northern Territory · closes 13 January 2027
- Darwin Region - Group 3 - Repairs and Maintenance of Airconditioning Plant and Equipment for a Period of 36 Months
Department of Logistics and Infrastructure · Northern Territory · closes 18 January 2027
- Panel Contract for the Hire of Plant and Equipment - Great Southern Region
MAIN ROADS WESTERN AUSTRALIA · Australia (Commonwealth) · no closing date published
- Panel Contract for the Hire of Plant & Equipment - Mid West-Gascoyne Region
MAIN ROADS WESTERN AUSTRALIA · Australia (Commonwealth) · no closing date published