Erosion Control - Muswellbrook Solar Farm and Bess
BOUYGUES CONSTRUCTION AUSTRALIA PTY LTD & EQUANS SOLAR & STORAGE AUSTRALIA PTY LTD · New South Wales
Environmental & Heritage Services, Environmental Management, Building & Facility Construction & Maintenance Services, Fencing · Value not stated
The scope includes:
Installation of silt fences
Installation of sediment basins
Installation of stabilised access points
Implementation of erosion and sediment control measures across the site
Bouygue ...
Is this tender for you?
We hold few facts about this tender. We found no closing date, requirements or documents.
- DatesDates last read on 28 September 2026. Check the buyer before you plan around them.Not checked on the portal
Summary of the published description
The scope includes the installation of silt fences, sediment basins, and stabilised access points. It also includes the implementation of erosion and sediment control measures across the site.
Contract awards for similar work
Matched by title words (heuristic)16 awards with “erosion” and “control” in the title; 9 publish a value: AUD 10,945 to 359,294, median 104,886. Not a price guide for this tender.
| Contract | Awarded | Value (AUD) |
|---|---|---|
Concept Design of Erosion & Sediment Control - CQU Economic Development Queensland · Queensland | 29 May 2026 | 10,945 |
RTCNS 04/26 Supply of Medium and High-Risk Erosion and Sediment Control Plan Transport and Main Roads · Queensland | 2 Mar 2026 | 104,886 |
Retained stubble can tie up early-season nitrogen as soil microbes break down residues, reducing availability for crop emergence and early growth. While traditional burning methods effectively remove residues, they are increasingly unpopular due to environmental concerns, social license issues, and the associated risks of erosion and nutrient loss. Stubble retention systems require robust research evaluating mechanical and chemical strategies—individually or combined— to improve trash flow at seeding, enhance weed control, and reduce disease risks. Grains Research and Development Corporation · Australia (Commonwealth) | 12 Feb 2026 | 359,294 |
Stage 1 erosion control of barracks foreshore Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts · Australia (Commonwealth) | 22 Dec 2025 | 64,740 |
RTCNS 56/25 DRFA Package 8 – Erosion & Sediment Control Plans Transport and Main Roads · Queensland | 3 Nov 2025 | 199,628 |
Showing 5 of 16.
Sign in to see who holds these contracts.