CO010 Bulk Earthworks Construction - Havieron Project - Brownfields Gold-Copper Development
GREATLAND PTY LTD · Western Australia
Civil Construction Services, Civil & Earthworks (General), Line & Pavement Marking, Road & Streetscape Construction & Maintenance, Stormwater Harvesting & Drainage Construction, Signage · Value not stated
The bulk earthworks involve site preparation, drainage and environmental measures, large-scale excavation, cut and fill operations, filling, grading, and compaction to prepare stable, level, and techn ...
Summary of the published description
The bulk earthworks involve site preparation, drainage, and environmental measures. The scope includes large-scale excavation, cut and fill operations, filling, grading, and compaction to prepare stable and level ground.
Contract awards for similar work
Matched by title words (heuristic)7 awards with “earthworks” and “bulk” in the title; 5 publish a value: AUD 56,243 to 3,300,000, median 300,000. Not a price guide for this tender.
| Contract | Awarded | Value (AUD) |
|---|---|---|
Bulk Earthworks Design - Whole of Site - Meadowbrook Economic Development Queensland · Queensland | 11 Jul 2025 | 56,243 |
Civil Construction and Bulk Earthworks - Maritime 3 - Northshore Hamilton Economic Development Queensland · Queensland | 11 May 2022 | 434,376 |
The Provision for Construction Services - Bulk Earthworks and Paving Crews RoadTek are required to undertake safety improvement works on the Peak Downs Highway (Eton to Mackay) between Chainages 62 to 87. The Peak Downs Highway is a strategic link in Queensland’s state-controlled road network linking mining and agricultural activities in the Bowen Basin and Central Highlands districts to service industry in Mackay and the ports of Mackay and Hay Point. The highway is the principal freight corridor supplying the coal mines of northern Bowen Basin. The route carries significant volumes of freight, including oversize and over-mass (OSOM) vehicles carrying large mining equipment, as well as local and commuter traffic, including drive-in, drive-out mining workers from Mackay, Moranbah and Emerald. Transport and Main Roads · Queensland | 4 Nov 2020 | 300,000 |
The Provision for Construction Services - Bulk Earthworks and Paving Crews RoadTek are required to undertake safety improvement works on the Peak Downs Highway (Eton to Mackay) between Chainages 62 to 87. The Peak Downs Highway is a strategic link in Queensland’s state-controlled road network linking mining and agricultural activities in the Bowen Basin and Central Highlands districts to service industry in Mackay and the ports of Mackay and Hay Point. The highway is the principal freight corridor supplying the coal mines of northern Bowen Basin. The route carries significant volumes of freight, including oversize and over-mass (OSOM) vehicles carrying large mining equipment, as well as local and commuter traffic, including drive-in, drive-out mining workers from Mackay, Moranbah and Emerald. Transport and Main Roads · Queensland | 4 Nov 2020 | 3,300,000 |
Bulk earthworks Gladstone Area Water Board · Queensland | 28 Jul 2020 | 294,195 |
Showing 5 of 7.
Sign in to see who holds these contracts.
More open tenders like this
With “earthworks” and “bulk” in the title · 3 open
- Stations and Shafts - Bulk and Detailed Earthworks - Suburban Rail Loop East , Tunnels North
Terra Verde JV · Victoria · closes 17 December 2026
- Bulk Earthworks - Boree Solar Farm
VENN ENERGY PTY LTD · New South Wales · no closing date published
- Bulk Earthworks - Lambruk Solar Farm
VENN ENERGY PTY LTD · New South Wales · no closing date published