Katherine Region - Victoria Highway - Watch Creek - Bridge Abutment Reconstruction and Reinstatement
- Reference
- T26-1279
- Jurisdiction
- Northern Territory
- Closes
- 28 September 2026
- Category
- Civil
- Type
- RFQ
- Value
- not stated
Description
A general outline of the work to be carried out under the Contract comprises excavation of the pavement on bridge approach on the Western end, test density of sub-grade, stabilise sub-base, prepare base course and seal it such that the settlement on bridge approach is rectified and smooth pavement transition to bridge is obtained.
Summary of the tender's own page
Power and Water Corporation (PWC) is issuing a public disposal by sale tender for the Temple Bar Water Pump Station at the Sadadeen Complex. The scope involves disposing of a pump, pump motor, transformer, and switchgear booster, which are intact and ready for dismantling or disposal. The awarded contractor is responsible for managing and loading the items during collection and transportation without causing environmental impact. Tenderers must also factor potential contaminants such as wastewater and cable insulation into their submissions.
Stated requirements
- Tenderers must account for potential contaminants including wastewater and cable insulation as part of their submission.
- Contractor is responsible for managing and loading the pump, motor, and booster during collection and transportation.
- Contractor must ensure there is no environmental impact during collection and transport.
Eligibility
- not stated
Source
Refreshed by the nightly source pipeline.
View source list pageThis portal doesn't give each tender its own link, so this opens the list it appeared on. Search there for the title above.
Want the best ones ranked for your business?
Paste your website. Stipple ranks open tenders by how well they fit and names the gaps. A free account can email you new tenders that match your business, only on days there is something new.